Realisations
Wrocław - Tarnogajska
11.09.2025
CONTRACK technology has already seen many successful implementations, but Wrocław presented us with one of the most interesting challenges. What makes this project so special? It involved a curved track with cant, requiring exceptional precision.
The work was divided into two stages:
1. Armii Krajowej Avenue – 5 slabs with a total length of 23.8 m, with curves of 33 and 37.3 m and a cant of 20 mm.
2. ul. ks. Czesława Klimasa – 7 slabs with a total length of 26.1 m, with arches of 46 and 50 m and a cant of 15 mm.
A total of 12 slabs were created, representing nearly 50 meters of passage with an area of 252 m². Prefabrication allowed for the maintenance of ideal track geometry, structural durability, and safety under intense tram traffic, proving that CONTRACK can cope even with demanding geometric conditions.
Stage 1. Armi Krajowej Avenue


Stage 2 - Ks. Klimasa Street



Similar posts
Product
Prefabricated tram crossings
See productPrefabrication of tram arches
See product


